Calvey Creek Riparian Mitigation Site – 2017
Riparian Mitigation Site Stream Bank Stabilization Water Quality Enhancement

There are 4,274 linear feet of intermittent stream channel and riparian corridor that will be...

Craghurst Riparian Mitigation Site – 2017
Riparian Mitigation Site Stream Bank Stabilization Water Quality Enhancement

The 3,025 feet of intermittent stream channel and riparian corridor on this site in the...

Meramec Bluffs Wetland Mitigation Bank – 2016
Riparian Mitigation Site Stream Bank Stabilization Water Quality Enhancement

Meramec Bluffs Wetland & Riparian Mitigation Site – The project began in 2007 with the...

City of Chesterfield Mitigation Site – 2013
Riparian Mitigation Site Stream Bank Stabilization Water Quality Enhancement

Chesterfield City Mitigation (Franklin County, MO) – This mitigation site measures some 60 acres in...

Riverlands Wetland Mitigation Site – 2010
Stream Bank Stabilization Water Quality Enhancement Wetland Mitigation Site

This 162-acre emergent wetland mitigation project was developed for the St. Louis Metropolitan Sewer District...

Red River Wetland & Riparian Mitigation Site – 2008
Riparian Mitigation Site Stream Bank Stabilization Water Quality Enhancement

This project consisted of locating a tract of land suitable to meet all of the...

Edmondson Creek Mitigation Bank – Pending
Riparian Mitigation Site Stream Bank Stabilization Water Quality Enhancement

Edmondson Creek Mitigation Bank (Saline County, MO) – Located in the Blackwater-Lamine Watershed in West...

Meramec Stream Restoration Site – 2006
Stream Bank Stabilization Water Quality Enhancement

This 17-acre riparian mitigation project for the Missouri Department of Transportation was developed in 2006....

Lower Grand Mitigation Bank – Pending
Riparian Mitigation Site Stream Bank Stabilization Water Quality Enhancement

Lower Grand Riparian Mitigation Bank (Chariton County, MO) – This sizable project is located near...